TodayFrom 1 January 2027From Q2 2028
Municipalities and companies

Today: a potential analysis on your own electricity meters. From 2027: your energy-sharing organiser.

The analysis is the first step and stands on its own. The organiser role is the next, and it exists from the day the executive order takes effect. Here is what you get, how it is done, and what happens after.

What the analysis answers

Two questions, with your own numbers behind them.

How much could you have shared last year?

We lay your consumption and your production over each other, meter by meter, quarter hour by quarter hour, one year back. Where a roof produced more than its building used while another of your buildings was using power, sharing could have happened. That figure is the potential.

What was it worth?

Shared power displaces the spot price and the supplier’s margin; grid tariffs, taxes and VAT are paid as before. We calculate with your own prices, so the figure is yours, not an average.

How it is done

Your data does not leave Energinet’s DataHub until you have given us permission yourself.

Business MitID

One person at your organisation logs in and gives Kvarters access to the meters the analysis should cover. The access can be withdrawn whenever you want.

DataHub

We fetch consumption (E17) and production (E18) through Energinet’s DataHub, one year back, at 15-minute resolution: the interval the executive order settles in.

The analysis

Same hour, same day: what could have been shared, what it was worth, and which buildings fit together. Then three scenarios for a larger plant.

The report

Four weeks after the authorisation. Figures, profiles and a recommendation, written so it can be put before the committee or the board.

What you get

  • The sharing potential in kWh and kroner, for the whole portfolio and per building
  • Consumption and production profiles for the buildings that matter most
  • Three scenarios for the next plant: as today, four times larger, forty times larger
  • A recommendation: what to do before 1 January 2027, and what can wait until 2028
  • A walkthrough at a meeting, where Martin answers the questions
Fixed price · fixed scope · four weeks · the offer as a PDF Order a potential analysis

Write how many meters it concerns, and the offer comes back within one working day.

The expansion analysis

Once the potential is known, the next question is how large the next plant should be. The expansion analysis works that out: how much more could be shared for every extra kilowatt on the roof, and where the limit lies before the surplus ends up in the grid anyway. It is ordered as an extension of the potential analysis and uses the same data.

From 1 January 2027

From 1 January 2027: your energy-sharing organiser

The executive order on energy communities and energy sharing creates the role of energy-sharing organiser (§ 24–25). It is the role Kvarters takes, from the day it exists.

What an organiser does

  • Holds the right to energy sharing on Energinet’s energy-sharing platform on your behalf
  • Talks to your electricity supplier and your grid company, so the sharing fits into the settlement
  • Makes the agreements between you and those you share with, and invoices and settles
  • Operates plants and storage for you if you wish, and keeps your data in one place
  • Links to your rights as an electricity customer, as the order requires

What it means for you

You own the plants and the buildings. You do not need to found an association or a company to share, and you do not need to change supplier. Kvarters organises the sharing, and today’s analysis becomes the first plan.

Municipalities that share must make at least 10 % of the shared power available to households (§ 18). It is an obligation, and it is also why your pool gets neighbours. The pools open when Energinet’s platform does, in the second quarter of 2028.

Today

For companies and business parks

The same applies to a company with solar on several sites, and to a business park where the neighbours want to share with each other. In 2026 we analysed seven companies in one business park. The Confederation of Danish Industry proposed industrial energy communities in business districts on 13 October 2026; energy sharing is the way to the same thing without founding anything. The rules are the same: one bidding zone, plants of up to 6 MW, settled every quarter hour.

The next step

Write to Martin with the number of meters. The offer comes as a PDF within one working day, and the analysis starts the day the authorisation is in place.

Martin Sponholtz, founder, answers himself. About.